This project required a boulder retaining wall to increase the size of the new tee. The hole increased by about 10 yards and there was room for a new pump station.
An old bunker transformed into a new one! The old sand trap was hard to maintain and washed out during heavy rains. The new bunker has been easier to play and maintenance has been reduced.