This project required concrete demo work. The hammer on the excavator made short work of the project, which was nice because the concrete was so thick.
This is a full basement addition. Nice soil! The footing was excavated to a 1" tolerance making the concrete work go smoother and quicker.
Shown below are picures from a house the needed to be torn down and rebuilt.